Help us improve this section of the site. Can we get your feedback? Click here

Africa Infrastructure: WSS Utility


Drag to rearrange the order



Separate thousands by commas

Format series



Customize Report

Use this option to create WDI, IDS Online tables etc.,

Title
Font Style Font Type
Font Color Font Size
Horizontal Alignment

Description
Font Style Font Type
Font Color Font Size
Horizontal Alignment
Apply Changes

Copy and paste this code to your website

Permanent link for this report

Share with your friends

Facebook Twitter Google +

Please log in to save your report


Share report
Snapshot Save


Clear Save
« »
» »
Preview
 
2004 
2005 
2006 
2007 
2008 
2009 
LAV 
MRV 
MRV1 
MRV2 
Access, private residential water connection (% of population)24.625.0........25.0....25.0
Access, residential water connection from neighbors (% of population)24.725.0........25.0....25.0
Access, standpost (%)....................
Average operating cost per cubic meter of water consumed (USD/m3)0.70.7........0.7....0.7
Average revenue per estimated cubic meter of wastewater collected (USD/m3)....................
Billing for water and wastewater (USD/year)16,279,097.716,114,717.3........16,114,717.3....16,114,717.3
Billing to government entities (USD)2,839,377.53,033,358.5........3,033,358.5....3,033,358.5
Billings to government entities (% of total billing)17.418.8........18.8....18.8
Book value of gross fixed assets (USD)79,209,167.694,959,289.4........94,959,289.4....94,959,289.4
Collection period (days)307.4143.2........143.2....143.2
Collection ratio (% of billed)93.3115.9........115.9....115.9
Connections with operating meter (number)115,375.0120,830.0........120,830.0....120,830.0
Continuity of water service (Hours per day)24.024.0........24.0....24.0
Cost of a meter of PVC pipe (USD/meter)5.35.8........5.8....5.8
Cost of services contracted out (% of operating costs)....................
Debt service (USD)687,129.4422,774.3........422,774.3....422,774.3
Debt service ratio (ratio)22.144.2........44.2....44.2
Efficiency of water consumption in the service area (ratio)....................
Employees per 1000 water connections (number/1000 connections)....................
Expenditure on energy (LCU)2,536,510.62,364,123.8........2,364,123.8....2,364,123.8
Full-time employees (number)..673.0........673.0....673.0
Functioning Installed standposts providing utility water (number)....................
Household size (number)6.06.0........6.0....6.0
Installed standposts providing utility water (number)....................
Kms of wastewater collection per 1000 population (km/1000.cap.)....................
Source: Africa Infrastructure: WSS Utility. Click on a metadata icon for original source information to be used for citation.
Selections have been modified. Click on "Apply Changes" at any time to refresh the report with the changes made. Otherwise, click on "Cancel" to go back to previous selections.
Cancel Apply Changes
Please log in to save

Kindly choose an option and press OK to continue

WB Staff Login Public Login


Close OK

Help/Feedback


Loading...